Bid Requests
Project Name: Pinole Library (Roof, HVAC, Electrical, and Accessibility Upgrades) Owner: Contra Costa County
Project Address: 2935 Pinole Valley Road, Pinole, CA Subcontractor Bids Requested By: Wednesday, May 7, 2025, 12:00 PM Areas of Work Available for Subcontracting: Roofing, Sheet Metal, Electrical, HVAC, Plumbing, Demolition, Abatement, Acoustical Ceilings, Drywall, Painting, Insulation, Surveying, Earthwork, Grading, Paving, Concrete, Structural Steel, Ceramic Tile, Doors, Frames, and Hardware, Toilet Partitions & Bathroom Accessories, Signage, Cleaning Plans and Specs available: www.cccounty.us/cpmprojects Estimated Total Project Cost: $3,391,127 Bidder's policy concerning assistance to subcontractors in obtaining bonds, lines of credit, and/or insurance: Bonds not required from subcontractors; Quiring will bear the expense of the required bonds. Prime Contractor/Bidder: Quiring General, LLC Address: 6660 Owens Drive, Pleasanton, CA 94588 Contact: Christian Guillen, cguillen@quiring.com Phone: (925) 332-2800 Fax: (559) 432-6614 Project Description: The project includes one building with a total of 15,245 SF to demolish and replace several building systems. The existing heating, ventilation, and air conditioning (HVAC) system will be demolished and replaced with a new all-electric HVAC system. The roofing system will include a full replacement of the built up roof and the metal standing seam roof. The electrical system will replace the existing electrical switchboard with a 1000A main switchboard, retrofit or new light fixtures with energy efficient light emitting diode (LED) bulbs, and power outlets on the main library floor for public use. In addition, the project accessibility improvements includes accessible parking re-location, path of travel improvements from the parking lot to the main entrance, public restroom upgrades as shown in the drawings entitled “Pinole Library Accessibility Upgrades, Pinole Library HVAC Replacement, Pinole Library Electrical Upgrade, and Pinole Library Roof Replacement.” Contractor shall be responsible for procurement of all equipment and materials.Quiring General, LLC - Pinole Library (Roof, HVAC, Electrical, and Accessibility Upgrades) Email To Friend« Go Back |
||
![]() |
||
© 2025 Small Business Exchange, Inc. |